NHS Buckinghamshire 1 MW project
How Solutions achieved £618K+ in lifetime savings with a 80kWp solar installation.
How Solutions achieved £618K+ in lifetime savings with a 80kWp solar installation.
How Colchester County High School achieved Education in lifetime savings with a 16.7kWp solar installation.
A 128.6kWp solar PV installation supporting sustainability and reducing grid reliance.
How HG Construction achieved £329K+ in lifetime savings with a 103.95kWp solar installation.
How Miller Leisure Ltd achieved £1.34M+ in lifetime savings with a 175.6kWp solar installation.
How Autogem House achieved £329K+ in lifetime savings with a Solar PV solar installation.
A 200 x 3.04kWp solar PV installation supporting sustainability and reducing grid reliance.
How NHS Hospital achieved Public Sector in lifetime savings with a 994.84kWp solar installation.